Products

Featured products

  • 303875 - Pull Out Basket - Shearer 3.0 Max
    303875 - Pull Out Basket - Shearer 3.0 Max
    It sinks 20mm to solve the problem of colision between the invisible handle and the disc. Extraction within extraction, classification refined: Fully hidden guide rails, silky slide.The sections are well-organized. One basket can handle all the tableware of various sizes needed for cooking.The transparent aesthetics embrace the lifestyle!
    More
  • 706031-BV Series Shallow Leather Basket-600mm
    706031-BV Series Shallow Leather Basket-600mm
    ■ Wardrobe Slide Out Leathery Clothes Basket ■ Simple design, easy to storage all kinds of clothing. ■ Outer frame: outer frame: space grade aluminium, advanced fluorocarbon technology, wear-resistant and scratch-proof. ■ Basket: hand-sewn and wrapped in high quality leather, perfect care experience. ■ Bottom plate: the bottom plate is strengthened to enhance the bearing capacity, so that the product will not be deformed in use
    More
  • 706051S-BV Series Deep Leather Basket-600mm
    706051S-BV Series Deep Leather Basket-600mm
    ■ Wardrobe Slide Out Leathery Clothes Basket ■ Simple design, easy to storage all kinds of clothing. ■ Outer frame: outer frame: space grade aluminium, advanced fluorocarbon technology, wear-resistant and scratch-proof. ■ Basket: hand-sewn and wrapped in high quality leather, perfect care experience. ■ Bottom plate: the bottom plate is strengthened to enhance the bearing capacity, so that the product will not be deformed in use
    More
  • 819311-H -G2.0 Series - Full Extension Soft-close Ball Bearing Slide with Double Springs
    819311-H -G2.0 Series - Full Extension Soft-close Ball Bearing Slide with Double Springs
    Soft-closing with double spring construction Double rows ofsolid steel balls provide stabledrawer opening and closing Full extension Durability: 50,000 times 48 hours withLevel 8 Salt Spray Test
    More

Contact us

Higold Group Star Headquarter Building Successfully Completed Construction

2021-03-24

Higold Group Star Headquarter Building Successfully Completed Construction on March 13,2021.

Higold Group



Mayor Wang Yong, Higold group Chairman Alwin Ou and government representatives, representatives of enterprises management, dealers and strategic partners, media representatives, attended the Higold star headquarter construction completion ceremony, witnessing the historic moment, opening Higold group into the next phase of the new campaign.

Star Headquarter

Completed Construction

Higold Group

Star Headquarter

Completed Construction

Higold Group

Star Headquarter

Completed Construction

Higold Group

Star Headquarter

Completed Construction

Higold Group

Star Headquarter


Get the latest price? We will reply as soon as possible (within 12 hours)

top